Hydroelectric Power Plant Augsburg

Hydroelectric power plant Augsburg
The 250 m2 large power plant in Augsburg was completed after a construction phase of one year. It supplies 15.000 households with clean energy. ARNOLD / WERNER used black concrete which allows the building to blend in with its surroundings.
Client: Luwa Energie
Location: Augsburg
Construstion period: 12 months
Completed: 2006